Projects

Flag
Kingdom

Eurirelandred


Projects

Level of progress (rounded down): 696

These great projects will astonish the rest of the world. But they are quite expensive. You can change the expenditures each winter in the budget and so influence the duration of the completion. It is not possible to work on more than one project simultaneously. A project begin is seen as a solved task, so other tasks are possible in this quarter, but no reforms or budget changes.

Consider carefully whether the state is really capable of paying the project! The completion can take more time than estimated, but in any case it will be completed.

Title Level of progress Duration Costs per annum Status
Monument 150 8 351.94 Bil. possible
Great wall 200 20 14.27 Bil. under construction
Atomic bomb 500 14 14.27 Bil. possible
Nuclear Disarmament 500 6 4.76 Bil. impossible
Missiles 540 16 23.78 Bil. possible
Cure for Malaria 600 8 57.07 Bil. possible
Orbital weapons 650 16 33.29 Bil. impossible
Personal Rapid Transit 650 60 33.29 Bil. possible
Strategic Defense Initiative 660 8 23.78 Bil. impossible
Geothermal Energy 780 35 66.58 Bil. impossible
Space elevator 900 20 19.02 Bil. impossible
Cure for cancer 900 70 475.60 Bil. impossible
Voyage to Mars 950 60 142.68 Bil. impossible
Weather Control 970 30 19.02 Bil. impossible
Lunar Colony 1100 70 42.80 Bil. impossible
Fusion power 1200 90 38.05 Bil. impossible