Projects

Flag
Bunte Republik

Augstred


Projects

Level of progress (rounded down): 1382

These great projects will astonish the rest of the world. But they are quite expensive. You can change the expenditures each winter in the budget and so influence the duration of the completion. It is not possible to work on more than one project simultaneously. A project begin is seen as a solved task, so other tasks are possible in this quarter, but no reforms or budget changes.

Consider carefully whether the state is really capable of paying the project! The completion can take more time than estimated, but in any case it will be completed.

Title Level of progress Duration Costs per annum Status
Monument 150 8 662.15 Bil. possible
Great wall 200 20 26.84 Bil. possible
Atomic bomb 500 14 26.84 Bil. possible
Nuclear Disarmament 500 6 8.95 Bil. impossible
Missiles 540 16 44.74 Bil. possible
Cure for Malaria 600 8 107.38 Bil. done
Orbital weapons 650 16 62.64 Bil. impossible
Personal Rapid Transit 650 60 62.64 Bil. done
Strategic Defense Initiative 660 8 44.74 Bil. impossible
Geothermal Energy 780 35 125.27 Bil. done
Space elevator 900 20 35.79 Bil. possible
Cure for cancer 900 70 894.80 Bil. possible
Voyage to Mars 950 60 268.44 Bil. impossible
Weather Control 970 30 35.79 Bil. possible
Lunar Colony 1100 70 80.53 Bil. impossible
Fusion power 1200 90 71.58 Bil. possible