Projects

Flag
Vereinigte Staaten von

Preussenred


Projects

Level of progress (rounded down): 1720

These great projects will astonish the rest of the world. But they are quite expensive. You can change the expenditures each winter in the budget and so influence the duration of the completion. It is not possible to work on more than one project simultaneously. A project begin is seen as a solved task, so other tasks are possible in this quarter, but no reforms or budget changes.

Consider carefully whether the state is really capable of paying the project! The completion can take more time than estimated, but in any case it will be completed.

Title Level of progress Duration Costs per annum Status
Monument 150 8 1,680.39 Bil. done
Great wall 200 20 68.12 Bil. done
Atomic bomb 500 14 68.12 Bil. done
Nuclear Disarmament 500 6 22.71 Bil. possible
Missiles 540 16 113.54 Bil. done
Cure for Malaria 600 8 272.50 Bil. possible
Orbital weapons 650 16 158.96 Bil. done
Personal Rapid Transit 650 60 158.96 Bil. done
Strategic Defense Initiative 660 8 113.54 Bil. possible
Geothermal Energy 780 35 317.91 Bil. possible
Space elevator 900 20 90.83 Bil. possible
Cure for cancer 900 70 2,270.80 Bil. possible
Voyage to Mars 950 60 681.24 Bil. done
Weather Control 970 30 90.83 Bil. possible
Lunar Colony 1100 70 204.37 Bil. possible
Fusion power 1200 90 181.66 Bil. possible