Projects

Flag
Kaiserreich

Russische Unionred


Projects

Level of progress (rounded down): 2164

These great projects will astonish the rest of the world. But they are quite expensive. You can change the expenditures each winter in the budget and so influence the duration of the completion. It is not possible to work on more than one project simultaneously. A project begin is seen as a solved task, so other tasks are possible in this quarter, but no reforms or budget changes.

Consider carefully whether the state is really capable of paying the project! The completion can take more time than estimated, but in any case it will be completed.

Title Level of progress Duration Costs per annum Status
Monument 150 8 1,424.06 Bil. € possible
Great wall 200 20 57.73 Bil. € done
Atomic bomb 500 14 57.73 Bil. € done
Nuclear Disarmament 500 6 19.24 Bil. € possible
Missiles 540 16 96.22 Bil. € done
Cure for Malaria 600 8 230.93 Bil. € done
Orbital weapons 650 16 134.71 Bil. € done
Personal Rapid Transit 650 60 134.71 Bil. € done
Strategic Defense Initiative 660 8 96.22 Bil. € possible
Geothermal Energy 780 35 269.42 Bil. € possible
Space elevator 900 20 76.98 Bil. € done
Cure for cancer 900 70 1,924.40 Bil. € possible
Voyage to Mars 950 60 577.32 Bil. € possible
Weather Control 970 30 76.98 Bil. € done
Lunar Colony 1100 70 173.20 Bil. € under construction
Fusion power 1200 90 153.95 Bil. € done

Site Links

Contact | GBT | Links | Data safety | Political game | Politics simulation | Economy simulation | Politics

2007-2017 by Malone, comfreak, Sheep